TIMELINE
Phase 1 of AERONAUTICA is planned across an approximately 18-month period, allowing the work to respond to seasonal conditions, location availability, and the complexity of constructed scenes.
Pre-Production (Months 1–6)
Location research and permissions, vessel adaptation and fabrication planning, casting development, costume preparation, and technical coordination. This phase establishes the practical framework required for on-site realisation.
Production (Months 7–15)
Photographic scenes are realised across multiple seasonal windows in different environments on the island. The schedule allows smaller scenes to be produced alongside more complex staging moments involving vessel positioning and larger participant groups.
Post-Production and Exhibition Preparation (Months 16–18)
Color work, file preparation, large-format print coordination, and planning of the premiere presentation in Palma. Documentation materials are finalised during this stage.
The timeline is designed to remain flexible while ensuring that the six works of Phase 1 form a coherent first chapter ready for public presentation. The objects, relationships, and workflows developed during this period support the continuation of the series beyond the initial phase.

AERONAUTICA reflects on movement, belonging, and the persistence of personal dreams through images shaped by Mallorca’s landscapes and traditions.